Answer:
6 2/25 tons cement
Step-by-step explanation:
If cement mixer held 6 3/4 tons=6.75 tons
Mr. Folley used=0.67
After use cement are=6.75-0.67=6.08
So,
0.08=2/25
That's why answer is 6 2/25 tons
Answer: The answer is 314.28 cm² (approx.).
Step-by-step explanation: Given that an engineer is going to install a new water pipe. The diameter of this circular pipe is, d = 20 cm.
We need to find the area 'A' of the circular cross-section of the pipe.
Given, diameter of the circular section is
So, the radius of the circular cross-section will be
Therefore, cross-sectional area of the pipe is
Thus, the answer is 314.28 cm² (approx.).
I think it would be 3.19.
Dividing 25.52 by 8.
Answer:
(4, -2)
Step-by-step explanation:
if you do process of elimination you find that 'a' doesn't work out but 'b' will . . . substitute -2 for 'y' and 4 for 'x' and see if the equation is true
-2 = -3/4(4) + 1
-2 = -3 + 1
-2 = -2