Answer:
$1.05
Explanation:
Mean is 40 quartz per day
standard deviation is 6 quartz per day
Optimal orders = mean demand + Standard deviation
Optimal order = 40 + 6
= 46 quartz per day
$0.35 * 2.84 * 49 / 46
= $1.05
Answer:
Estimated manufacturing overhead rate= $0.2 per direct labor dollar
Explanation:
Giving the following information:
Direct labor, $30,000
Factory overhead applied $6,000.
<u>To calculate the predetermined overhead rate, we need to use the following formula:</u>
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
6,000= Estimated manufacturing overhead rate*30,000
6,000 / 30,000 = Estimated manufacturing overhead rate
Estimated manufacturing overhead rate= $0.2 per direct labor dollar
Answer:
flexible time
Explanation:
Since their work time is not fixed, these employees have flexible work time. Often, this kind of working time is deemed to be a non-financial work benefit, as most people prefer to define their own work time. Sometimes, it is debated if this is really beneficial for the employees.
Nonetheless, they do have to respect their daily work time slot,
Answer:
X (the variable on the horizontal axis) will increases by 2.
Explanation:
The slope of a straight line is -3. So, m=6.
Slope of a straight line is
Y (the variable on the vertical axis) decreases by 6.
Change is y = -6
We need to find the change in (the variable on the horizontal axis).
Substitute the given values in the above formula.
Note: All options are incorrect.
Therefore, X (the variable on the horizontal axis) will increases by 2.
Earned a degree from a four-year college at least. I HOPE IT HELPS :)