Answer:
- 4, - 3, - 2, - 1, 0
Step-by-step explanation:
Given
- 2 < n + 3 < 4 ( subtract 3 from each interval )
- 5 < n < 1
This indicates that n ≠ - 5, 1 but all values in between, that is
n = - 4, - 3, - 2, - 1, 0 ← possible values of n
Answer:
d) one solution; (4, 1)
Step-by-step explanation:
It often works well to follow problem directions. A graph is attached, showing the one solution to be (4, 1).
_____
You know there will be one solution because the lines have different slopes. Each is in the form ...
y = mx + b
where m is the slope and b is the y-intercept.
The first line has slope -1 and y-intercept +5; the second line has slope 1 and y-intercept -3. The slope is the number of units of "rise" for each unit of "run", so it can be convenient to graph these by starting at the y-intercept and plotting points with those rise and run from the point you know.
27)
Equation of the existing water pipe's line
a) slope, m = rise / run = Δy / Δx = 3/2
b) y-intercept, b = 3
equation: y = mx + b = (3/2)x + 3
Equation of the new water pipe's line
slope, m = - 1 / (slope of the perpendicular line) = - 1 / (3/2) = - 2/3
point (0,2)
=> y - 2 = (-2/3) (x - 0) => y = (-2/3)x + 2 <---- equation of the new pipe
28)
two parallel lines have the same slope =>
slope, m = rise / run = Δy / Δx = [4 - 0] / [11 - 8] = 4 / 3
point (4,5) => y - 5 = (4/3) (x - 4)
=> y = (4/3)x - 16/3 + 5 = (4/3)x - 1/3
y = (4/3)x - 1/3 <--- equation of the new bike path
The answer is either 4 or 8 I do believe
Answer:
D. a = 60 and b = 58.8
Step-by-step explanation:
Z-score:
In a set with mean and standard deviation , the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Z-score for data point a is 0.
This means that a is the mean, that is, a = 60.
The z-score for data point b is -0.4.
This means that b must be a value below the mean, that is, a value below 60.
The option that satisfies a = 60 and b < 60 is option D, which is the answer.