Answer:
The driving force for (a) heat transfer is temperature difference. (b) electric current is voltage difference. (c) fluid flow is pressure or hydraulic head difference.
Explanation: (a) The driving force for heat transfer is temperature difference. Heat transfer between two mediums is possible only if the two mediums are at different temperature, the higher the temperature, the higher the heat transfer.
(b) The driving force for electric current is voltage difference. Voltage difference is defined as the potential difference in charge between two points in electrical field. For electric current to occur,the voltage must be high.
(c) The driving force for fluid flow is pressure difference or hydraulic head difference. For fluid to move upward,it requires energy.
Answer:
0
Explanation:
Weight = mass x gravity
if gravity = 0 then Weight =0 as well
Answer:
a = -2.4 m/s²
Explanation:
Given,
The initial speed of the bus, u = 24 m/s
The final speed of bus, v = 12 m/s
Time taken to reach final speed is, t = 5.0 s
The acceleration of the body is given by the change in velocity by time
a = (v - u) / t
= (12 - 24) / 5
= -2.4 m/s²
The negative sign in the acceleration indicates that the bus is decelerating.
Therefore, the acceleration of the bus is, a = -2.4 m/s²
Answer:
Answer:
Debt payments to income ratio = 22.74%
Explanation:
Debts payment to Income ratio is calculated as follows:
= \frac{Total\ debt\ payment}{Total\ Income}
Total Income
Total debt payment
We have total debts payment = auto loan payment 685 + student loan payment685+studentloanpayment375 + credit card payment 125 =125=1,185
Total Income = $5,210
Note: Credit card is also a kind of debt as firstly all the expenses are met during the period and then the payment is made at the end of the period, therefore, there is a loan in the period. Therefore, it will be considered for payment of debt.
Debt payments to income ratio = \frac{1,185}{5,210} = 22.74
5,210
1,185
=22.74
That means the debts are 22.74% of income.
Answer:
the horizontal distance covered by the cannonball before it hits the ground is 327.5 m
Explanation:
Given;
height of the cliff, h = 210 m
initial horizontal velocity of the cannonball, Ux = 50 m/s
initial vertical velocity of the cannonball, Uy = 0
The time for the cannonball to reach the ground is calculated as;
The horizontal distance covered by the cannonball before it hits the ground is calculated as;
Therefore, the horizontal distance covered by the cannonball before it hits the ground is 327.5 m