Answer:
for number one the answer is no for 7 the answer is 5 seconds
Step-by-step explanation:
Since 470/6 = 78.333 it would take you 78.333 days to work 470 hours.
#2 is 5
#3 is 18.9
#4 is 14.1
#14 is yes it does
Thank you for posting your question here at brainly. Feel free to ask more questions.
<span>The best and most correct answer among the choices provided by the question is FALSE.</span><span>
</span><span>
<span>Hope my answer would be a great help for you.</span></span>
Consider the line y = 2x + 1, shown at the right. Notice that this slope will be the same if the points (1,3) and (2, 5) are used for the calculations. For straight lines, the rate of change<span> (slope) is constant (always the same). For every one unit that is moved on the x-axis, two units are moved on the y-axis.hope this helped. </span>