108 mins✍ 48÷4=12 1 sprinkler takes 12 mins 48+48=96 = 8 sprinklers 1 more equals 12 so 96+12=108
w-(-3)=7
Pretend that there is a -1 in front of the bracket
w-1(-3)=7
Mutiply the bracket by -1
(-1)(-3)=3
w+3=7
Move +3 to the other side. Sign changes from +3 to -3.
w+3-3=7-3
w=4
Answer: w=4
Multiply 7x6 since when using pemdas, multiplication and division can be inverted, i.e. if multiplication is before division then you multiply and vice versa.
Hope this helps!
There are two pints in a quart
so 3 times 2 equals 6
3 qt = 6 pt
Answer:
The correct answer is 10 days.
Step-by-step explanation:
To fill a trench, 5 men work for 6 hours a day for eight days.
Total work hours required is given by 5 × 6 × 8 = 240 hours.
The same work is supposed to be done by 3 men working 8 hours a day.
Let these three men need to work for x days.
Therefore total work hour these group of three men gave = 3 × 8 × x = 24x hours
Therefore the work hour of both the group of 5 men and 3 men should be equal.
⇒ 24x = 240
⇒ x = 10
Therefore the group of 3 men have to work for 10 days to fill the trench.