In order to ship 107520 units, 107520 units need to be picked as well
In the Picking team, 1 worker picks 210 units in 1 hour
So, the number of units picked by 1 worker in a shift of 8 hours = 210 * 8 = 1680 units
So, the number of employees required to be assigned to the Picking team = Quantity to be picked / Number of units picked by 1 worker in a shift of 8 hours = 107520 / 1680 = 64.03571 = 64
The number of employees to be assigned to picking in order to ship a total of 107,520 units for the shift is 64.
The gadgets for measuring periods are millimeter (mm), centimeter (cm), meter (m), and kilometer (km). The devices for measuring weight are kilogram (kg) and gram (g). The gadgets for measuring extent are milliliter (ml) and liter (L).
While the costs or value of manufacturing of an item is divided by means of the quantity, the end result is called a unit fee. Context: The unit price of a set of homogeneous products is the entire fee of the purchases/sales divided with aid of the sum of the quantities.
Learn more about the unit here:
brainly.com/question/25862883
#SPJ4
Answer:
Effect Corporate Change
Explanation:
Making formal statements, holding rites and rituals, utilizing employee training and coaching, demonstrating how a leader reacts to a crises, being a role model, and giving rewards, promotions, and bonuses are some of the teaching methods that organizations can utilize to effect corporate change. Change is one of the important and most difficult process for any organization. It needs to be carried out slowly as it has been manifested in the above given statement as well. Employees need to be given training, promotions, rewards and bonuses, they must be listened, their concerns should be addressed in order to make change process easy and smooth.
Answer: (A) Assistant project managers
Explanation:
The main role of the assistant project manager is that it basically assisting the project managers by coordinating, analyzing and planning the specific project.
The main responsibility of the assistant project managers is to supporting the given function of the project and execute the given project.
According to the given question, a typical project office is basically responsible for managing the large projects which include both the project manger and the assistant project managers.
Therefore, Option (A) is correct answer.
Answer:
a. The estimated coefficient for size is approximately <u>13.81</u>.
b. In the regression, two predictors are used. These two predictors are size and fireplace (FP).
Explanation:
a. The estimated coefficient for size is approximately _____.
Estimated coefficient for size = Standard Error of size * t-Stat of size = 1.2072436 * 11.439 = 13.81
Therefore, the estimated coefficient for size is approximately <u>13.81</u>.
b. How many predictors (independent variables) were used in the regression?
Independent variables can be described as variables that are changed or manipulated in order to measure the effect of their changes on the dependent variable. Independent variables are therefore also called predictors because they employed to predict the dependent variable.
In the regression, two predictors are used. These two predictors are size and fireplace (FP).