Answer:
D
Step-by-step explanation:
The domain is the x value which in this case would be the hours of training
Number of pallets moved in 4.5 hours = 108
converting 4.5 hours in minutes we get,
4*60 + 0.5*60 = 240+30 = 270 minutes
So, 108 pallets were moved in = 270 minutes
1 pallet was moved in = minutes
As the tie will get over in 2 hours or 2*60 = 120 minutes, the number of pallets that can be moved will be = pallets.
Hence, 48 pallets can be moved before quitting time.
Your rise over run will be -3 over 1 your going to start at the point 5 on the y-axis when your at the point 5 go down 3 then over to the right 1 keep going till it off the graph. Now do the opposite way and go up 3 from 5 and to the left 1 and keep doing that till it’s off the graph.
Hope this helps