Answer:
The correct word for the blank space is: equity.
Explanation:
People expect the government to implement policies that will boost the overall economy and that will provide equal opportunities. Though, sometimes certain criteria must be met so those policies can apply. This causes people who are not eligible to access the policies' benefits to believing the regulation itself does not have an equity principle.
Under- or Over-Applied Manufacturing Overhead:
Under- or Over-Applied Manufacturing Overhead refers to the balance in the manufacturing overhead control account after the actual overhead costs that were incurred and the applied overhead for the period has been recorded
1 .The appleid overhead is the predetermined rate of $2.40 per machine hour multiplied by the actual number of machine hours (75,000), so it is $180,000.
The applied overhead is debited to work-in-process inventory and credited to the manufacturing overhead account.
2. The underapplied or overapplied overhead for the year is the difference between the actual and applied overhead. We can show it in the T-account like this:
3. The company estimated its total overhead cost to be $192,000 and its total machine hours to be 80,000. The actual overhead cost was $184,000 and the actual machine hours were 75,000. We can see that the main reason why the manufacturing overhead was underapplied was the fact that it worked fewer machine hours than anticipated with a proportional decrease in the manufacturing overhead costs incurred. This is normal because an element of manufacturing overhead is fixed.
To know more about overhead applied manufacturing overhead:
brainly.com/question/14703509
#SPJ4
Answer:
$15,000
Explanation:
Total Assets-Remaining liabilities=Solvency
$232,000-$217,000=$15,000
If the waiver of loan makes the taxpayer solvent,then the extent by which he is solvent will be included in his/her gross income.
The difference between the standard cost of a product and its actual cost is called a cost variance. Therefore the statement is true.
<h3>What is the objective of variance?</h3>
Changing across all of the pieces of information in a data set, variance is a measurement of distribution. It enables us to estimate how far away a set of factors are from each other.
To describe the variation or difference between the standard cost of a product and its actual cost the use of cost variance is done. It is utilized to estimate the financial performance of any project.
Therefore, the statement is True.
Learn more about Variance, here:
brainly.com/question/16269880
#SPJ1
Answer:
<h2>
Value of X = 1</h2>
<h2>
Value of y = 3</h2>
Solution,
Using substitution method,
y + x = 4
Move 'x' to the left hand side and change its sign:
y = 4 - x --------> equation (i)
Now,
2y - X = 5
putting the value of y from equation (i)
2( 4 - x ) - X = 5
8 - 2x - x = 5
8 - 3x = 5
- 3x = 5 - 8
- 3x = - 3
The difference sign (-) will be cancelled in both sides
3x = 3
3x/3 = 3/3
X = 1
Value of X is 1
Now, replacing the value of X in equation (i)
y = 4 - x
= 4 - 1
= 3
Value of y is 3
Hope this helps...
Good luck on your assignment...