Answer: 81.85 km/hr
Converting m/sec into km/hr, 25 m/sec = 90 km/hr
Average =
Time = 50/90 = 5/9 hr
next 120 km at an average speed of 80km/h
=> Time = 120/80 = 3/2 hr
last part of its journey at an average speed of 90km/h in 35 Minutes
time = 35 minutes = 35/60 hr = 7/12 hr
Distance covered = 90 * 7 /12 = 105/2 km
Total Distance = 50 + 120 + 105/2 = 435/2 km
Total time = 5/9 + 3/2 + 7/12 = ( 20 + 54 + 21) /36 = 95/36
Average speed = (435/2)/(95 /36) = 432 * 18 /95 = 81.85 km/hr
Answer:
I'm not good with the type of math on 3, so I'm going to answer 4. (P.S I don't know the question you're asking, so I'm going to assume you want to know the area and perimeter of the shapes.
Step-by-step explanation:
To solve number 4 I added the width of the 2 triangles to give me the width of the rectangle, so then 2 times 9 is 18. Then for the triangles. The formula for triangles is base times height divided by 2. So we add the areas of all shapes and we get: 18+6+24=48m. So the area for number 4 is 48 meters.
(hope this was your question)
The piece of ribbon would be 75 inches. The ribbon would be 75 inches because 1 foot would be 12 inches and you would multiply 12 by 6 to get 72. Then, 1/4 of a foot would be 3 inches because you could divide 12 and 4(the denominator you are dealing with) to get 3. Then, add 72 + 3 to get 75. Hope this helps!
Answer:
The answer is 1500.
Step-by-step explanation:
To solve this problem you should change 3% to a decimal. We do this by moving the decimal 2 places to the left. The decimal form of 3% is 0.03. We then have to divide 45/0.03 in order to get our answer.
I hope this helped :)