9514 1404 393
Answer:
4 1/2 days
Step-by-step explanation:
The time is given by ...
time = quantity/rate
time = (3/4 fence)/(1/6 fence/day) = (3/4)(6) days = 4 1/2 days
Answer: Figure 2.
Step-by-step explanation:
Suppose that we have an angle with measure ∠M, a bisector would be a line that divides this angle in two equal parts, such that each new angle has measures (∠M)/2
Then the correct option will be the one that has two equal angles.
In figure 2, we can see that RP divides the angle SRQ in two angles 52°, then RP is the bisector of the angle.
Then the correct option is figure 2.
(x3)(x4) is x7 because when you have a problem like that, you have to ADD your exponents.
-(m4)3 is -m12 since you're multiplying them.
(z3)5 is z15
y4 x y5 is y9
thats all i know of. hope it helps cx
The maximum number of visits for a member of science museum is 36.
Step-by-step explanation:
Given,
Membership fee = $8
Per visit fee = $1
Total cost = $44
Let,
x be the number of visits
y be the total cost
Total cost = per visit fee*number of visits + membership fee
y = x+8
The maximum number of visits for a member of science museum is 36.
Keywords: variable, addition
Learn more about variables at:
#LearnwithBrainly
Using the normal distribution, it is found that 63.18% of the area under the curve of the standard normal distribution is between z = − 0.9 z = - 0.9.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean and standard deviation is given by:
- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
The area within 0.9 standard deviations of the mean is the <u>p-value of Z = 0.9(0.8159) subtracted by the p-value of Z = -0.9(0.1841)</u>, hence:
0.8159 - 0.1841 = 0.6318 = 63.18%.
More can be learned about the normal distribution at brainly.com/question/4079902
#SPJ1