Answer:
-58.876 kJ
Explanation:
m = mass of air = 1 kg
T₁ = Initial temperature = 15°C
T₂ = Final temperature = 97°C
Cp = Specific heat at constant pressure = 1.005 kJ/kgk
Cv = Specific heat at constant volume = 0.718 kJ/kgk
W = Work done
Q = Heat = 0 (since it is not mentioned we are considering adiabatic condition)
ΔU = Change in internal energy
Q = W+ΔU
⇒Q = W+mCvΔT
⇒0 = W+mCvΔT
⇒W = -mCvΔT
⇒Q = -1×0.718×(97-15)
⇒Q = -58.716 kJ
Answer:
According to Oxford Dictionaries "Precision" means "the quality, condition, or fact of being exact and accurate."
Explanation:
Hope this helps! :)
When balanced forces follow up on an object, the object won't move. If you push against a wall, the wall pushes back with an equal but opposite force. Neither you nor the wall will move. Forces that cause a change in the motion of an object are unbalanced forces.
Work needed = 23,520 J
<h3>Further explanation</h3>
Given
height = 12 m
mass = 200 kg
Required
work needed by the crane
Solution
Work is the transfer of energy caused by the force acting on a moving object
Work is the product of force with the displacement of objects.
Can be formulated
W = F x d
W = Work, J, Nm
F = Force, N
d = distance, m
F = m x g
Input the value :
W = mgd
W = 200 kg x 9.8 m/s²x12 m
W = 23520 J
Forces are exerted I believe : all of the above
The action force might be Tyler throwing the ball
I don't know the last one