So if it is 60 miles per hour it is basically 60 miles per 60 minutes. when you simplify it, it is going to be 1/1=1 The answer is 1 mile per minute
I am not sure but wouldn't it be y=3x-6 and y=4x-7
Let x be a random variable representing the number of skateboards produced
a.) P(x ≤ 20,555) = P(z ≤ (20,555 - 20,500)/55) = P(z ≤ 1) = 0.84134 = 84.1%
b.) P(x ≥ 20,610) = P(z ≥ (20,610 - 20,500)/55) = P(z ≥ 2) = 1 - P(z < 2) = 1 - 0.97725 = 0.02275 = 2.3%
c.) P(x ≤ 20,445) = P(z ≤ (20,445 - 20,500)/55) = P(z ≤ -1) = 1 - P(z ≤ 1) = 1 - 0.84134 = 0.15866 = 15.9%