Answer:
4.1
Step-by-step explanation:
Because t is the number of weeks, replace t with 6 in the equation and solve for s.
s = -0.25(6) +4
s = -1.5 +4
s = 2.5
Now replace t with multiples of 6, use 12 and 18:
s =-.25(12) +4 = 1
s-0.25(18) +4 = -0.5
now fins the difference between the time frames:
2.5 - 1 = 1.5
1 - 0.5 = 1.5
The ice melts 1.5 meters every 6 weeks.
There are 32,760 different orders for the first four positions.
This is a permutation where repetition is not allowed; the formula for that is:
For our problem, we have:
(A)
P(<em>X</em> < 61.25) = P((<em>X</em> - 55.4)/4.1 < (61.25 - 55.4)/4.1)
… ≈ P(<em>Z</em> ≤ 0.1427)
… ≈ 0.5567
(B)
P(<em>X</em> > 46.5) = P((<em>X</em> - 55.4)/4.1 > (46.5 - 55.4)/4.1)
… ≈ P(<em>Z</em> > -2.1707)
… ≈ 1 - P(<em>Z</em> ≤ -2.1707)
… ≈ 0.9850
Answer:
Quality Plumbing charges more per hour.
In the graph, you can see that it would cost $150 for their work plus $100 per hour based on the slope of the line.
A Plus Plumbing charges $140 for their work plus $60 per hour.