Answer:
There isnt even a graph shown to graph on.
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
We basically have to cancel values on both sides until they are both on common ground.
7 + 3x = 5x + 13
-7 from both sides...
3x = 5x + 6
-5x from both sides...
-2x = 6
/-2 from both sides...
x = -3
Hope this helps!
Answer:
[x-3] [x+4]
Step-by-step explanation:
You look to see if you spot the appropriate factors strait away. If you can not immediately determine them you have to consider all of the potential ones and reason out which ones work.
Step-by-step explanation:
72 times 108 = 7776 sq inches
to convert inches to yds divide by 36
7776/ 36 = 216 sq yds