104,976 square feet you do 324 x 324, because its 324 to the 2 power.
Answer:
The percent of callers are 37.21 who are on hold.
Step-by-step explanation:
Given:
A normally distributed data.
Mean of the data, = 5.5 mins
Standard deviation, = 0.4 mins
We have to find the callers percentage who are on hold between 5.4 and 5.8 mins.
Lets find z-score on each raw score.
⇒ ...raw score, =
⇒ Plugging the values.
⇒
⇒
For raw score 5.5 the z score is.
⇒
⇒
Now we have to look upon the values from Z score table and arrange them in probability terms then convert it into percentages.
We have to work with P(5.4<z<5.8).
⇒
⇒
⇒
⇒ and .<em>..from z -score table.</em>
⇒
⇒
To find the percentage we have to multiply with 100.
⇒
⇒ %
The percent of callers who are on hold between 5.4 minutes to 5.8 minutes is 37.21
I believe it is 3. since it touches the x-axis in three areas
Answer:
D but see below.
Step-by-step explanation:
It can be factored if you are allowed to use square roots.
(p + 5√5)(p - 5√5)
Usually, you are not allowed to do that. Usually you must be working with whole numbers or rational well behaved fractions.
I think, given the above comment, the answer is D
Answer:
And solving we have:
And we can write the expression like this:
The vertex for this case would be:
And the minimum for the function would be 3 and there is no maximum value for the function
Step-by-step explanation:
For this case we have the following equation given:
We can complete the square like this:
And solving we have:
And we can write the expression like this:
The vertex for this case would be:
And the minimum for the function would be 3 and there is no maximum value for the function