Answer:
the polynomial has degree 8
Step-by-step explanation:
Recall that the degree of a polynomial is given by the degree of its leading term (the term with largest degree). Recall as well that the degree of a term is the maximum number of variables that appear in it.
So, let's examine each of the terms in the given polynomial, and count the number of variables they contain to find their individual degrees. then pick the one with maximum degree, and that its degree would give the actual degree of the entire polynomial.
1) term contains four variables "x" and two variables "y", so a total of six. Then its degree is: 6
2) term contains two variables "x" and five variables "y", so a total of seven. Then its degree is: 7
3) term contains four variables "x" and four variables "y", so a total of eight. Then its degree is: 8
This last term is therefore the leading term of the polynomial (the term with largest degree) and the one that gives the degree to the entire polynomial.
Answer: 112.5
Step-by-step explanation:
The question really is asking whats 45% of 250
1. Calculate 10% of the total
2. Calculate 5% of the total
3. Solve for 40% of the total
4. Add 5% of the total
1. 10% of 250
250 = 100%
*divide both sides by 10*
25 = 10%
2. 5% of 250
25 = 10%
*divide both sides by 2*
12.5 = 5%
3. 40% of 250
10% + 10% + 10% + 10% = 40%
25 + 25 + 25 + 25 = 40%
50 + 50 = 40%
100 = 40%
4. 45% of 250
100 = 40%
12.5 = 5%
100 + 12.5 = 40% + 5%
<em>112.5 = 45%</em>
Answer:
Step-by-step explanation:
The rules For fractions: Multiple Denominator to Denominator and Numerator to numerator!
Ok: For number 1
3/5*1/1= 3/5
Number 2
3/4*9/4=27/16= 1 11/16
Number 3
14/21=2/3*33/7=66/21= 3 3/21= 3 1/7
Number 4
6/18*9/42= 1/3*3/14= 3/42= 1/14
Number 5
22/15*45/4= 33/2=16 1/2
Number 6
3/28* 35/6= 105/168= 5/8
Number 7
2/7*35/12=60/84=5/6
Number 8
16/15*21/24=16/15* 7/8=112/120=14/15
Hope It helps!!!!
Answer: the answer is c^2 / 10
Hope this helps :p
Step-by-step explanation:
Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours