Answer:
$128
Step-by-step explanation:
1. We need to find how much 1 yard of material cost.
If needed, use a calculator*
120/75=1.6
2. Now we need to know how much 15 yards of material cost.
1.6 times 15=24
3. The buyer ordered an additional 90 yards. If we know how much 75 yards cost, and 15 yards, all you have to do is...
120+24=144
90 yards=$144
4. The additional cost is $144
(Note: the total cost would be $264 (120+144=264))
Answer:
Each step is 30 inches
Step-by-step explanation: One yard is 36 inches. 10 yards is 360 inches.
360 divided by 12 is 30.
Answer:
yes. The cost of the insurance is less than the probability cost of the operation
Step-by-step explanation:
yes. The cost of the insurance is less than the probability cost of the operation
The cost of health insurance = $1200
Cost of dramatic injury operation= $500,000
chances of need of operation= 47.3% over a 20 years period
the amount of pay insurance after 20 years=
probable of cost operation= 0.473*500,00= $236,500
clearly the cost of insurance is less than the probable cost of operation.
128.34 = 12817/50 :)
hope it helps
Answer:
The answer is t/3=20
The right diagram is the one that has the orange boxes with 20s and has a t on top