Obtain a customer signed statement acknowledging that an annuity transaction is not recommended if a customer decides to enter into an annuity transaction that is not based on the insurance producer's or insurer's recommendation.
<h3>Who is responsible for verifying your suitability?</h3>
The insurer or third party delegate authorized pursuant to section 224.
6(c) of Regulation 187 conducts a suitability review prior to the issuance of an insurance product or the effectuation of a sales transaction; and.
The insurer has procedures designed to prevent financial exploitation and abuse.
<h3>What factors are important considerations when determining suitability of an annuity sale?</h3>
Suitability Information Gathered by an Insurer
- Age.
- Annual income.
- Financial situation and needs, including the financial resources you're using to fund the annuity.
- Financial experience.
- Financial goals and objectives.
- Intended use of the annuity.
- Financial time horizon.
Learn more about insurance here:
<h3>
brainly.com/question/15171641</h3><h3 /><h3>#SPJ4</h3>
Amelia works in the manufacturing career cluster. She probably works in a plant workshop or factory
What is manufacturing career cluster?
To turn raw resources into finished goods, the Manufacturing cluster combines a passion for engineering, design, and technology with planning and organizational abilities.
What is considered a manufacturing worker?
Jobs in manufacturing are ones that start with components or raw materials and end with creating new products. You can find these occupations in a factory, plant, or mill. As long as goods rather than services are produced, they can also exist inside a house.
What are the positive impacts of manufacturing?
The timetable can be optimized by the program to lower errors and inefficiencies and produce products of higher quality. Cost savings over the long term are made possible by technology, which operates with greater efficiency, less waste, and fewer workers.
Learn more about career cluster: brainly.com/question/15225914
#SPJ4
Answer:
$378,000
Explanation:
average weekly demand 70 per distribution center
average shipment size to each distribution center is 450
average lead time 3 weeks
each distribution center has a 3 week safety stock
pipeline inventory: average lead time x average demand per distribution center x average price of each modem x number of distribution centers = 3 weeks x 70 units x $360 x 5 = $378,000
pipeline inventory in transit = $378,000
The pipeline inventory represents the minimum average that the company needs to have to at least meet the weekly demand for its product.
Answer:
See below
Explanation:
The importance of establishing control in this case stems from the fact that as the points in these type of charts exceed beyond the set limits, it is possible that those points get eliminated and a revised value of R can be obtained. Accordingly, the limits and the center line also get revised on an R chart and x chart. This also allows for the limits to get tighter on both of the charts.