Given that the method of revenue calculation is straight line method, the equation modeling this will be given by:
y=mx+c
where:
m=slope
x=time
c=initial value.
from our question:
slope,m=$7000
time=T
y(x)=R(t)
hence the formula after the sixth month will be:
R(t)=7000T+45000
The answer is 1.87 pounds heavier. This is found out by subtracting 2.8 from 4.67.
Hope this helps!
The answer is, 9/50
0.18 = 0.18/1
0.18/1 x 100/100 = 18/100
18/100 divided by 2/2 = 9/50
In conclusion the answer is 9/50.
Hopefully that helped! :)
Answer:
I-
Step-by-step explanation:
Um okay.
Step-by-step explanation:
$20/hr carpenter pay
$25/hr blacksmith pay
Let c = hours working carpentry
Let b = hours working as blacksmith
c + b = 30 {equation 1}
20c + 25b = 690 {equation 2}
In equation 1 solve for one variable in terms of the other.
c = 30-b
Substitute that into equation 2:
20(30-b) + 25b = 690
600 - 20b + 25b = 690
5b = 90
b = 90/5
b = 18 hours working as a blacksmith
c = 30-b = 30-18 = 12 hours as a carpenter