Answer:
0.025 grams
Step-by-step explanation:
The water in the stopcock has a volume of 25 mL initially, After that, the whole water was drained out. So we have:
Volume of drained water = (25 mL)(1 x 10⁻⁶ m³/1 mL)
Volume of drained water = 25 x 10⁻⁶ m³
Density of drained water = 1000 kg/m³
So, for the mass of drained water:
Density of drained water = Mass of drained water/Volume of drained water
Mass of drained water = (Density of drained water)(Volume of drained water)
Mass of drained water = (1000 kg/m³)(25 x 10⁻⁶ m³)
<u>Mass of drained water = 0.025 gram</u>
Density
Answer:
It will take 4 hours to dig in the garden
Step-by-step explanation:
First we have to calculate the diameter, for this we will use the formula to calculate the circumference of a circle and we will clear the diameter
d = diameter
π = 3.14
c = circumference
c = π * d
d = c / π
d = 88yd / 3.14
d = 28.025yd
round to the nearest whole number
28.025 = 28
d = 28yd
To know how many hours it takes, we divide the diameter by the speed
t = time
v = velocity
t = d / v
t = (28yd) / (7yd/h)
t = 4h
It will take 4 hours to dig in the garden
18×7+5 is your answer. The answer for the problem is 18×7=126.
126+5=131.
Answer:
$190.65
Step-by-step explanation:
123.00/20=6.15 per hour
6.15x31hours worked = $190.65
Answer:
the correct answer is 8,000ft
Step-by-step explanation:
sin30°=4000ft/h
hsin30°=4000ft
h=4000ft/sin30°
h= 8,000ft