Answer:
Total cost of job A881= $9,445
Explanation:
<em>The total cost of Job 881 would be the sum of the direct cost and the manufacturing overhead
</em>
Total cost = Direct material + direct labour + variable manufacturing overhead + Fixed Overhead
Direct material and labour represent cost of material and labour incurred wholly and directly for Job A881
The overhead absorption rate(OAR) would be used to charge fixed manufacturing overhead to Job A881
The absorbed overhead = OAR × actual machine hours used for Job A881
OAR = budgeted overhead ÷ budgeted machine hours
OAR = $155,000 ÷ 50,000 machine hours = $3.1 per machine hour
Fixed manufacturing overhead absorbed = $3.1 × 100 = $3,100
Variable manufacturing overhead = $3.40 × 100 = $3,400
Total cost of job A881= 645 + 2,300 + 3,400 + 3,100 = $9,445
Total cost of job A881= $9,445