Answer:
Step-by-step explanation:
From the question we are told that:
Drice difference p.d=0.10.
a)
Generally from the Table given above
i)
Point estimate =Predicted Demand
Therefore
Point estimate = 8.5371
ii)
With the Lower 95% Mean Demand and Upper 95% Mean Demand Given in the Table above
Confidence interval =(8.1402,8.9340)
b)
Generally from the Table given above
i)
Point estimate =Predicted Demand
Therefore
Point estimate = 8.5370
ii)
With the Lower 95% Mean Demand and Upper 95% Mean Demand Given in the Table above
Confidence interval =(6.8890 , 10.1860
c)
Generally from the Table given above
99% C.I.:8.0047 , 9.0556
99% P.I.:6.3154 , 10.7588