<h2>Hello!</h2>
The answer is:
It will take 4.5 hours for two bricklayers to lay a total of 3150 bricks.
<h2>Why?</h2>
From the statement, we know that on Monday, bricklayers took 3 hours to lay a total of 4200 bricks.
So, we have that the rate of the four bricklayers is given by the following equation:
Therefore, we have that the rate of the four bricklayers is 1400 bricks per hour, meaning that each bricklayer can lay 350 bricks per hour.
Now, to calculate how many hours it will take to the 2 bricklayers to lay a total of 3150, we need to divide the calculated rate (for bricklayers) by two, since there are only 2 bricklayers working on Tuesday.
So, calculating the time, we have:
Hence, we have that it will take 4.5 hours for two bricklayers to lay a total of 3150 bricks.
Have a nice day!
Answer:
-2x + 3
Step-by-step explanation:
-5x/5 - 20/5 - 4x/4 + 28/4 ➡-x - 4 -x +7 ➡-2x + 3
Answer:
Length: 21 cm and Width: 6cm
Step-by-step explanation:
Let be the width and length of the rectangle. We know:
-------- eq. 1
(Perimeter of the rectangle) ------- eq. 2
Substitute equation 1 in equation 2:
Using the value of y, we find x.
Answer:
Step-by-step explanation:
Sample proportion p is the proportion of favourable numbers to total number in the sample
By central limit theorem and also approximation of binomial to normal , we have sample proportion for large number of samples will be normal
with mean = sample proportion
and std deviation =
Thus we find standard deviation of proportion sample is inversely proportional to the square of the sample size n.
It follows automatically that as sample size increases std deviation decreases.
Here from 80 sample size was made to 200
So std deviation would decrease automatically