Answer:
2.28% probability that a person selected at random will have an IQ of 110 or greater
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
What is the probability that a person selected at random will have an IQ of 110 or greater?
This is 1 subtracted by the pvalue of Z when X = 110. So
has a pvalue of 0.9772
1 - 0.9772 = 0.0228
2.28% probability that a person selected at random will have an IQ of 110 or greater
Look all you have to do is with each question draw a line to the answer I am going to help you. Mark the 3rd question with answer A Mark the second question with b and the first one C I might be wrong with the first one. Hope this helps
Answer: The mean of the data is 433.75, variance of the data is 99667.19 and the standard deviation of the data is 315.7011.
Explanation:
The given data is 900, 35, 500 and 300.
The number of observation is 4.
Formula of mean is,
The formula of variance is given below,
The variance of the data is 99667.19
The standard deviation of the data is 315.7011.
The other information or values of given chart is shown in the attached table.
You have two choices.
The minimum possible cost to operate your bat factory for a day is $390,
and there are two quantities of bats that both cost that much.
One possibility:
Produce no bats at all per day. Zero. Nada. None.
Cost = 0.06(0)² - 7.2(0) + 390 = $390 per day.
The other choice:
Produce 120 bats per day.
Cost = 0.06(120²) - 7.2(120) + 390
= 0.06(14,400) - 7.2(120) + 390
= 864 - 864 + 390
= $390 per day.
If you produce any other number of bats in a day ... more than zero
but not 120 ... then it will cost you more than $390 to operate the factory
that day.
Set like terms on each side by adding six to the first side and subtracting 1/2x from the first side. this gives you 9<1.5x. divide both sides by 1.5 to get 66. the answer is 4) x>6