Its either centimeters or inches.
I prefer centimeters
So my understanding from this you have to make it y = mx + b so m stands for the slope there’s different ways to find it as shown in the first picture. I’ll try to make another comment since this only lets me take one picture at a time.
Answer:
The answer is B.
Step-by-step explanation:
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
2
Step-by-step explanation:
Degree is the highest power of a term
I hope im right!