Answer:
72.3
Step-by-step explanation:
Given that:
The arithmetic sequence:
The first term of the sequence = 3 since k = 0
i.e (3 + 0.26(0)) = 3
The last term of the sequence = 6.64
i.e (3+ 0.26(14)
= (3 + 3.64)
= 6.64
Total no of terms = 15 i.e from 0 to 14
∴
The partial sum of the arithmetic sequence =
= 72.3
Answer:
a) 9000 ft-lb
b) 9000 ft-lb
Step-by-step explanation:
Equation for the work:
The equation for the work done is given by:
In which F is the force needed and d is the distance. The time does not interfere on the work.
A 300-lb gorilla climbs a tree to a height of 30 ft
This means that
Thus
The work done in both cases is of 9000 ft-lb, as the work is not a function of time.
The answer should be A. If you need work I can show you.
There would be 8 whole(s) in total.