The next step after publishing a project schedule activities, start/end times and resources are identified is TO CONFIRM THE AVAILABILITY OF RESOURCES
Once the resources are identified the project manager should make sure that the identified resources are available
Complete Question:
Which term describes a category of attacks that generally are conducted over short periods of time (lasting at most a few months), involve a smaller number of individuals, have little financial backing, and are accomplished by insiders or outsiders who do not seek collusion with insiders?
Group of answer choices.
A. Critical infrastructure category
B. Unstructured threat category
C. Highly structured threat category
D. Structured threat category
Answer:
B. Unstructured threat category.
Explanation:
An unstructured threat category is a term which describes a category of attacks that generally are conducted over short periods of time (lasting at most a few months), involve a smaller number of individuals, have little financial backing, and are accomplished by insiders or outsiders who do not seek collusion with insiders.
Answer:
B. Ladder safety or personal fall arrest systems
Explanation:
Under the provisions of OSHA laws, where the total length of a climb equals or is greater than 24 feet or 7.3 meters, ladders must be equipped with one of the following safety devices.
- ladder safety devices
- Self-retracting lifelines, and rest platforms at intervals not to exceed 150 feet (45.7 m)
- A cage or well and multiple ladder sections with each ladder section not to exceed 50 feet (15.2 m) in length.
The safety devices are cautionary provisions to protect a climber should the unexpected happen.To ascend a height of 24 feet and more is exhausting, which poses a risk. The climber may feel dizzy or develop height phobia due to exhaustion.
Answer:
c. 55
Explanation:
As for the provided information, we know that
Percentage of active condominiums shall be calculated where the base shall be total property and the numerator shall be the active condominiums.
As provided condominiums = 40%
Active condominiums = 8.25 40% = 3.3
Total property time = 8.25 40% + 4.5 60%
= 3.3 + 2.7 = 6.0
Therefore, percentage of active condominiums = = 55%