Answer:
The maximum profit is reached with 4 deluxe units and 6 economy units.
Step-by-step explanation:
This is a linear programming problem.
We have to optimize a function (maximize profits). This function is given by:
being D: number of deluxe units, and E: number of economy units.
The restrictions are:
- Assembly hours:
- Paint hours:
Also, both quantities have to be positive:
We can solve graphically, but we can evaluate the points (D,E) where 2 or more restrictions are saturated (we know that one of this points we will have the maximum profit)
The maximum profit is reached with 4 deluxe units and 6 economy units.
Answer:
510
Step-by-step explanation:
It's assumed 0 is not an integer.
M is obviously 2. The area of a square is the square of its side length. If this area must be an integer, then it must be the fourth integer, which is 4. The side length,
A prime number is a positive integer which can be divided exactly by only itself and 1. In fact, it has only those two factors. The last statement excludes 1 as a prime number. Hence, the prime numbers less than 10 are 2, 3, 5 and 7. Their sum is .
To evaluate ,
Hello Chrisd117991999.
If the missile was going 900mph and we are trying to find the horizontal velocity
This could be 3.88, and rounding it to the nearest hundredth would be <u><em>3.90 miles per minute</em></u>
:)
Answer:
Her final answer should have been x = 1/2.
Step-by-step explanation:
Her 2 errors were that she didn't distribute the 2x to both 4 and -17 and that she made the 13 positive instead of negative when she added 4 and -17 together.
Correct solution:
8(x-3)+7=2x(4-17)
8x-24+7=8x-34x
-17=-34x
The negatives on both sides cancel each other out
x = 1/2