Answer:
(a) 120 square units (underestimate)
(b) 248 square units
Step-by-step explanation:
<u>(a) left sum</u>
See the attachment for a diagram of the areas being summed (in orange). This is the sum of the first 4 table values for f(x), each multiplied by 2 (the width of the rectangle). Quite clearly, the curve is above the rectangle for the entire interval, so the rectangle area underestimates the area under the curve.
left sum = 2(1 + 5 + 17 + 37) = 2(60) = 120 . . . . square units
<u>(b) right sum</u>
The right sum is the sum of the last 4 table values for f(x), each multiplied by 2 (the width of the rectangle). This sum is ...
right sum = 2(5 +17 + 37 +65) = 2(124) = 248 . . . . square units
Answer:
It will take 3.214 minutes.
Step-by-step explanation:
<em>It is given that, the conveyor belt transports 300 cans in 5 mins and the smaller belt transports 300 cans in 9 minutes.</em>
Thus , the speed of conveyor belt is,
=
and of smaller belt is,
=
Thus, when both are used together,
<em>conveyor belt will transport (60)(t) cans and smaller belt will transport (t) cans per minute.</em>
Thus the equation becomes,
t =
Inside a triangle, all inside angles add up to 180°
So, add the two angles:
26.4°+33.7°=60.1°
180°-60.1°=119.9°
b=119.9°
Don’t know sorry I need point
Answer:
-918.55
Step-by-step explanation: