Answer:
0.6
Step-by-step explanation:
First we will calculate rate of work of rosa and amy.
work done by rosa in time t=t*1/7
Work done by Amy and rosa=t(1/7+1/4.2)
t/7+t/a=t/4.2
t=10.5 hr
Always keep remember those formula or logic belowWork rate × Time to finish the job = 1 job done
Work rate = (1 job done) / (Time to finish the job)
Time of doing the job = (1 job done) / (Work rate)
Answer:
C. 3rd one Fraction 10/24
Step-by-step explanation:
3/4 - 2/6 = 0.41 or = 10/24 or it could be equal to 5/12 are 10/24, 15/36, 20/48 and 25/60 or as Decimal 0.41
Step-by-step explanation:
Hope This Helped
The variable is b, the coefinet is 1/3
remember
ab-ac=a(b-c)
1/3b-1/3=1/3(b-1)
there, factored
Answer:
Step-by-step explanation:
X/7=3/2 multiply by : 5
x = 21/2