Answer:
D. a = 60 and b = 58.8
Step-by-step explanation:
Z-score:
In a set with mean and standard deviation , the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Z-score for data point a is 0.
This means that a is the mean, that is, a = 60.
The z-score for data point b is -0.4.
This means that b must be a value below the mean, that is, a value below 60.
The option that satisfies a = 60 and b < 60 is option D, which is the answer.
Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.
Step-by-step explanation:
me manda as respostas em português
women / total students = 714 / 1295 = 0.551351351 ≈ 55.14%
<span>ANSWER: About 55.14% of the students are women. </span>
45 divided by 3= 15 then 15 times 4 =60 mph