Hello from MrBillDoesMath!
Answer: NO solution possible!
Steps:
Let "n" be the first even number. We are told that
n + (n+2) + (n+4) + (n+6) + (n +8) = 216
The third number, the value we want, is boldfaced above.
Simplify the above equation:
5n + ( 2 + 4 + 6 + 8 ) = 216 or
5n + 20 = 216 or
5n = 196
n = 196/5 is NOT an integer value. This problem, as stated, has no solution.
Regards, MrB
We are given the equation:
0.6 x + 4.8 = 7.2
In this case, the multiplication property of equality states
that whatever is multiplied on one side should also be multiplied on the other
side. Now we need to find the number that will make everything a whole number,
in this case 5. Multiply everything by 5:
5 * (0.6 x + 4.8 = 7.2)
3 x + 24 = 36
However we can see that we can still further simplify the
equation by multiplying everything by 1/3:
(1/3) * (3 x + 24 = 36)
x + 8 = 12
or
x = 4
The slope of the line is calculated using
y2 - y1 / x2 - x1
Substituting the given values
-8 - 27 / 5 - 0 = -7
The rate of change or the slope is -7
And the initial value is the value of y when x is 0. From the first coordinates, the initial value is 27.
Total value of 100 measurements
100 * 23
2300
Total value of additional 50 measurements
50 * 27
1350
Total value of 150 measurements
2300 + 1350
3650
Average of 150 measurements
3650 / 150
24.3
25 > 24.3
Answer is B
Answer:
10 days
Step-by-step explanation:
We are given that
Each person takes 56 days
7 painters take time= painter days
In first 6 days , 7 painters take time=painter days
After 6 days , 28 volunteers are added then,
Total persons=28+7=35
Now, remaining days=392-42=350
Therefore, number of days are required before the painting of the king of rock 'n' roll is completed=days
Hence,10 more days are required before the painting of the king of rock 'n' roll is completed