Based in the historical cost principle, the total cost of
the land would be the summation of all cost, either direct or indirect.
Therefore it would be:
Cost of Land = $90,000 cash + $5,000 commission + $7,000
demolishing
Cost of Land = $102,000
<span> </span>
Answer:
A promise to deliver a deed
Explanation:
The term, 'strict performance' is used to describe a contract between two parties. A contract is an agreement between two parties, and it is legally binding. When discharging contracts involving services, 'substantial performance' is required. For example, if I tell a painter to paint my house blue except for the kitchen and storeroom which should be painted white, and he does accordingly but failed in painting the kitchen white, he has performed substantially even though there was a minor breach. The consequences of which would be borne by him.
'Strict performance' is required in contracts where the terms are stated in express terms and the standards are very high. A 'deed' is such a contract because it is a document specifying the legal rights of a person or the ownership of a property. It requires the signatures of the two parties. Therefore, strict performance and adherence to the contractual deed are required.
The highest score is the best option upon concluding the multi-criteria analysis .
<h3>What is a multi-criteria analysis' benefit?</h3>
By evaluating the results, performance, implications, and trade-offs of various policy alternatives, a Multi-Criteria Analysis (MCA) can be used to discover and contrast them. MCA offers a methodical method for supporting complicated decisions in accordance with predetermined standards and goals.
<h3>What is a multi-criteria analysis' benefit?</h3>
Managers can make environmental management decisions that involve trade-offs between a variety of intended management action outcomes with the aid of multi-criteria analysis. Transparent decision modeling begins with clearly specified criteria and hierarchically arranged objectives (particularly when employing qualitative measures).
To know more about multi-criteria analysis visit:
brainly.com/question/14863437
#SPJ4
Answer:
Correct answer is C. $ dollars.
Calculation:
Rate of Retun PU = (21%*605,000)/58,700 = 2.16
Fixed factory overhead PU = 38,500/58,700 = 0.66
Fixed selling and administration PU= 8000/58,700 = 0.14
Variable DM PU = 5.17
Variable Labour PU = 1.88
Variable FOH PU = 1.33
Variable selling and Admin PU = 4.5
By adding all above mentioned per unit cost we get 15 dollars aprox
so
Correct answer is 15 dollar.