75/25 = 3
3x25 = 75
$25 per hour
Answer:
48 ≥ 4x + 2y
44 ≥ 2x + 2y
First, we will look at assembling hours.
"The standard model requires 4 hours to assemble [<em>and</em>] the artisan model requires 2 hours to assemble"
We also know they have 48 hours per day for assembly, x is standard model and y is artisan model.
48 = 4x + 2y
Lastly, they do not <em>need</em> to make that many, but they <em>can</em> so we will use greater than or equal to.
48 ≥ 4x + 2y
Now let us look at finishing hours.
"The standard model requires ... 2 hours for finishing touches. The artisan model requires ... 2 hours for finishing touches."
We also know they have 44 hours per day for assembly, x is standard model and y is artisan model.
44 = 2x + 2y
Again, they do not <em>need</em> to make that many, but they <em>can</em> so we will use greater than or equal to.
44 ≥ 2x + 2y
If the axis of symmetry is x=-1, the vertex will have x-coordinate -1.
The point (0, 5) cannot be the vertex. The friend is not correct.
_____
If the point (1, 5) is on the graph so is the image of that point when it is reflected across the axis of symmetry. That image point is (-3, 5). A parabola that goes through points (1, 5) and (-3, 5) will not go through point (0, 5).
Answer:
28j + 21
Step-by-step explanation:
combine like terms
7(2j+ 3+ 2j)
7(4j+3)
Distribute
7(4j + 3)
=
28j + 21
Answer:
The one that is on the bottom half and on the right side.
Step-by-step explanation:
(0,30) to (10,0)
Because the x value 0 represents the time in which the paint job started and ends in the value 10
While the y value 30 is the amount of paint he started with and ends with 0