Answer:
21
Step-by-step explanation:
I think your suppose to find the greatest common factor
Answer:
Therefore,
Correct options are
A) 2 × 100 + 0 × 1 + 0 × 1/10 + 6 × 1/100
D) 2 × 100 + 6 × 1/100
Step-by-step explanation:
Given:
Number is
200.06
For option A)
2 × 100 + 0 × 1 + 0 × 1/10 + 6 × 1/100
= 200 + 0 + 0 + 0.06
= 200.06
Which is CORRECT.
For option B)
2 × 100 + 0 × 1 + 0 × 1/100 + 6 × 1/1,000
= 200 + 0 + 0 + 0.006
=200.006
Which is INCORRECT.
For option C)
2 × 100 + 6 × 1/10
= 200 + 0.6
= 200.6
Which is INCORRECT.
For option D)
2 × 100 + 6 × 1/100
= 200 + 0.06
= 200.06
Which is CORRECT.
Therefore,
Correct options are
A) 2 × 100 + 0 × 1 + 0 × 1/10 + 6 × 1/100
D) 2 × 100 + 6 × 1/100
Answer:
centre = (2, 4)
Step-by-step explanation:
The equation of a circle in standard form is
(x - h)² + (y - k)² = r²
where (h, k) are the coordinates of the centre and r is the radius
Given
x² + y² - 4x - 8y - 5 = 0
Rearrange the x/y terms together and add 5 to both sides
x² - 4x + y² - 8y = 5
Use the method of completing the square on both the x/y terms
add ( half the coefficient of the x/y terms )² to both sides
x² + 2(- 2)x + 4 + y² + 2(- 4)y + 16 = 5 + 4 + 16
(x - 2)² + (y - 4)² = 25 ← in standard form
with centre (2, 4) and r = = 5
Answer:
Step-by-step explanation:
In costing analysis, direct materials, labour and direct expenses aggregate to prime cost. Alternately, the aggregate of indirect materials, labour and expenses is termed as overhead. Overheads are classified into fixed and variable.
Variable overhead is one which varies directly as per number of units produced
Variable overhead rate variance = actual costs -(AHxSR)
= Actual costs - (Actual hours x std rate)
= Actual hours x actual rate - actual hours x std rate
Hence option D is right.