The average wait time is simply the averages of all the wait times in a product category. For instance, a custom watch manufacturer might have a wait time that ranges from 5 days to 10 days for a model A watch depending on the options. The average wait time for the model A watch is 7.5 days.
The area is 7.07
A=1/4(pi)d^2
Answer:
A
Step-by-step explanation:
Based on the information given the percentage increase is 5%.
<h3>Percentage increase</h3>
Using this formula
Percentage increase=Population several years later-Population for year/Population for one year×100%
Let plug in the formula
Percentage increase=236,360-225,000/225,000×100
Percentage increase=5%
Inconclusion the percentage increase is 5%.
Learn more about percentage increase here:brainly.com/question/11360390
Answer:
f(x) = 8 + 0.25x
Step-by-step explanation:
The minimum cost is $8, for up to 4 pounds.
The added cost is ($0.25/oz)(x), where x is trhe ounces over 4 pounds
The total cost is the sum of these two:
f(x) = 8 + 0.25x