Answer:
The answer to your question is: 20
Explanation:
Atomic number is the number of proton and atom has. Each element has a specific number of protons, if the number of protons change, then this is a new element.
Mass number is the number of protons and neutrons and atom has.
Mass number = protons + neutrons
Data
Number of protons = ?
Atomic number = 20
Then,
atomic number = number of protons = 20
Answer:
A)
B)
C)
D) mosquitoes speed in part B is very much larger than that of part C.
Explanation:
Given:
- Distance form the sound source,
- sound intensity level at the given location,
- diameter of the eardrum membrane in humans,
- We have the minimum detectable intensity to the human ears,
(A)
<u>Now the intensity of the sound at the given location is related mathematically as:</u>
..........................................(1)
<em>As we know :</em>
is the energy transferred to the eardrums per second.
(B)
mass of mosquito,
<u>Now the velocity of mosquito for the same kinetic energy:</u>
(C)
Given:
- Sound intensity,
<u>Using eq. (1)</u>
Now, power:
Hence:
(D)
mosquitoes speed in part B is very much larger than that of part C.
Answer:
Its gravitational potential energy is 117.6 joules.
Explanation:
Answer:
V=IR
V=0.8×2.5
V=2V
where V=potential difference
I=Current
R=Resistance
.........
Answer:
The total work done by Brad each day is 176400 J
Explanation:
Hi there! The work done by a force (F) pointed in the same direction as the displacement (d) is calculated as follows:
W = F · d
The force applied is equal to the weight of Brad, that is calculated as follows:
Weight = m · g
Where:
m = mass of Brad
g = acceleration due to gravity (9.8 m/s²)
Then:
Weight = 60 kg · 9.8 m/s² = 588 N
Let´s find the vertical distance traveled by Brad each day:
He exercises 20 min per day. Each minute Brad does 60 steps. In total, Brad steps up (20 min · 60 steps/min) 1200 steps. If each step has a height of 0.25 m, the total distance traveled by Brad will be
(1200 steps · 0.25 m/step) 300 m.
Then, the total work done by Brad is
W = F · d
W = 588 N · 300 m
W = 176400 J
The total work done by Brad each day is 176400 J