Answer:
no worries about the other day and I had literally forgotten about the other night and was just so I could tell me how I felt and I had a flat rate that you and I had a
If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
A right angle is 90 degrees, an obtuse angle is larger than 90 degrees and an acute angle is less than 90 Degrees.
The angle shown is smaller than 90 degrees so it is c. Acute
Answer: 112.50
Step-by-step explanation: