Answer:
Step-by-step explanation:
1). If a point C is lying on a line segment RB,
Then RB = RC + CB
Since, RB = 45, CB = 3x - 12 and RC = 2x + 9
45 = (2x + 9) + (3x - 12)
45 = (2x + 3x) - 3
48 = 5x
x =
x = 9.6
2). Since, RC = 2x + 9
RC = 2(9.6) + 9
= 19.2 + 9
= 28.2 units
3). Distance between the two points and is given by the formula,
d =
Distance between the points A(2, -2) and D(-2, 2) will be,
=
=
= 5.657
≈ 5.66 units
Answer:
Project A: $55,000 Project B: $50,800 Contractor should choose project A
Step-by-step explanation:
The expected value of the project is the sum of products of profit and its probability:
In thousands, ...
A: (50×0.6) +(80×0.3) +(10×0.1) = 30 +24 +1 = 55 . . . thousand
B: (100×0.1) +(64×0.7) +(-20×0.2) = 10 +44.8 -4 = 50.8 . . . thousand
__
The contractor should choose Project A based on the expected value of profit.
Answer:
60 pieces
Step-by-step explanation:
The rate of pieces to packages is 15/1.
Multiply this rate by 4 to get the answer.
15 * 4 = 60
It should be b but i don’t have paper with me so i’m not sure