Answer:
it’s actually gonna be 12:49. the clock is losing seconds meaning that it’s behind the actual time.
Step-by-step explanation:
48x5 = 240 seconds
240/60 = 4 hours
8:49 + 4 hours = 12:49
Answer:
8x^2 + 6x + 36xy^2 + 24y^2
Step-by-step explanation:
First, multiply the two terms inside the second set of parentheses by-2x; we get 8x^2 + 6x.
Next, multiply the same two terms by -9y^2; we get 36xy^2 + 24y^2.
Now add these products together:
8x^2 + 6x + 36xy^2 + 24y^2 This is the desired product.
Answer:
213
Step-by-step explanation:
convert percent to decimal 48%=0.48
144x0.48= 69.12
estimate 69.12 we got 69
144+69=213
Answer:
1) the quadrants go counter clockwise, Quadrant I is the upper right square, Quadrant II is the upper left square, Quadrant III is the lower left square, and Quadrant IV is the lower right square.
2) Quadrant II
3) Quadrant IV
4) Quadrant III
5) Quadrant I
6) Both would be on the horizontal axis
7) Both would be on the vertical axis
Step-by-step explanation:
Hope this helped!