Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
Answer:
87°
Step-by-step explanation:
it can be seen directly
if you want angle AOD
it's 78°
Answer:
Use the "find vertically opposite angle" method.
a = 80°
To find the other angles:
Since the angles equal up to 360 which makes a full circle shape...
360 - 80 - 80 = 200 (B and C)
200 ÷ 2 = 100 (Angle for B and C since they are vertically opposite, hence having the same angle)
b = 100°
c = 100°