For number 2. The answer is $6.49
Answer:
B. 18
Step-by-step explanation:
The 4 machines can produce x units in 6 days. This means they have a daily total rate of x/6 units per day.
Since the machines are similar and that they work at the same rate, this means that the individual rates of each machine would be x/6/4 = x/24 units per day.
Now we are looking at producing 3x units in 4 days. This means that we want to produce 3x/4 units in a single day. Now, since each machine would work at a rate of x/24, we need to know the number of machines we need. To know this number, we simply divide what is to be achieved by the individual rate:
This is 3x/4 divided by x/24. This mathematically means 3x/4 * 24/x = 18 machines
I think its D. 32.6 s/ft and appoximatley 0.03 ft/s
Answer:
No, According to triangle Inequality theorem.
Step-by-step explanation:
Given:
Length given are 4 in., 5 in., 1 in.
We need to check whether with these lengths we can create triangular components.
The Triangle Inequality Theorem states that the sum of any 2 sides of a triangle must be greater than the measure of the third side.
These must be valid for all three sides.
Hence we will check for all three side,
4 in + 5 in > 1 in. (It is a Valid Condition)
1 in + 5 in > 4 in. (It is a Valid Condition)
4 in + 1 in > 5 in. (It is not a Valid Condition)
Since 2 condition are valid and 1 condition is not we can say;
A triangular component cannot be created with length 4 in, 5 in, and 1 in by using triangle inequality theorem (since all three conditions must be valid).
Answer:
A. right 2, up 3
Step-by-step explanation:
We have that,
The function is transformed to .
We see that,
The function f(x) is translated 2 units to the right and 3 units upwards to obtain the function g(x).
So, the correct transformation is 'right 2, up 3'.
Hence, option A is correct.