The work done by the elephant to lift one log is the force multiplied by the height at which the log has been lifted:
And so, the total work done to lift the 7 logs is 7 times the work done to lift each log:
The time taken for him to move the bin 6.5 m is 2.30 s.
The given parameters;
- <em>weight of the load, w = 557 N</em>
- <em>force applied , F = 410 N</em>
- <em>angle of force, = 15°</em>
- <em>coefficient of kinetic friction = 0.46</em>
- <em>distance moved, d = 6.5 m</em>
The net horizontal force on the recycling bin is calculated as follows;
where;
- <em>m is the mass of the recycling bin</em>
- <em /><em> is the frictional force </em>
W = mg
The net horizontal force on the recycling bin is calculated as;
The time taken for him to move the bin 6.5 m is calculated as follows;
Thus, the time taken for him to move the bin 6.5 m is 2.30 s.
Learn more here:brainly.com/question/21684583
The F Ring, the Cassini Division, and the C Ring are bright ring features. They are bright due to the low concentration of materials within them, which allows sunlight to shine through.
A particle smaller than an atom or a <span>cluster of such particles </span>