Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
$110
Step-by-step explanation:
We are looking for the decrease in money per desk purchased. Because the x-axis is the number of desks purchased, what we have to find is the (opposite) of the slope. The formula to represent slope can be written as:
We can substitute the points given, (2, 480) and (5, 150) and simplify:
We would multiply by -1 because we are asking for the decrease, and negative increase is decrease. -1 * -110, gives us $110
-25/12
You have to change the denominator the the least common multiple then multiply the numerator by the number you multiplied it’s denominator with.