Complete Question:
Determine the utilization and the efficiency for each of these situations:
a. A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per
day and an effective capacity of 8 loans per day.
b. A furnace repair team that services an average of four furnaces a day if the design capacity is six furnaces a day and the
effective capacity is five furnaces a day.
c. Would you say that systems that have higher efficiency ratios than other systems will always have higher utilization ratios than
those other systems? Explain.
Explanation:
It's not (true) actually. Whether the design capacity is comparatively (high), the utilisation could be (low) even though the efficiency was (high).
Utilisation = Output / Design capacity = x 100%
Efficiency = Output / Effective capacity =
Utilisation =
Efficiency =
U = 1000/2000
e = 1000/1000
<span>Family A: marginal rate 20%, average rate 10%</span><span>
Family B: marginal rate 40%, average rate 23% </span><span>
The marginal tax rate is the rate paid on the last dollar of income; this would be whatever tax bracket the family is in. The average price is the total tax divided by the total revenue. </span><span>
Family A: </span><span>
</span><span>
total income $40,000: this includes $10,000 at 0%, $20,000 at 10% (tax of $2,000), and $10,000 at 20% (tax of $2,000). The last rate paid is 20% so that is the marginal rate; the total tax paid is $4,000, divide that by $40,000 total income, that is the average rate. </span><span>
Family B: </span><span>
</span><span>
total income $100,000: this includes $10,000 at 0%, $20,000 at 10% (tax of $2,000), $20,000 at 20% (tax of $4,000), $30,000 at 30% (tax of $9,000), and $20,000 at 40% (tax of $8,000). The last rate paid is 40% so that is the marginal rate; the total tax paid is $23,000, divide that by $100,000 total income, that is the average rate.</span>
Answer:
Crash the schedule.
Explanation:
Fast-track can complete the task earlier but takes more money. Assign more experienced people will cost the management more money. Cut scope reduces the project requirement and finishes the task earlier. Therefore, options A B and D can not be the answer.
Crash the schedule (option C) is the answer because it allocates enough resources to complete the task earlier without spending more money.
1 share of exxon, pennys pickles isnt exactly the most booming market right now
Saturn and Jupiter both have large quantities of liquid
hydrogen and liquid metallic hydrogen while Neptune and Uranus just have the
gaseous form of hydrogen because they are too little to compress hydrogen to
its metallic state. Also, the two latter planets have icy cores.