Answer:
A-The 14 people selected to participate
Step-by-step explanation:
Answer:
2580 ft-lb
Step-by-step explanation:
Water leaks out of the bucket at a rate of
Work done required to pull the bucket to the top of the well is given by integral
Here, function is the total weight of the bucket and water feet above the bottom of the well. That is,
is the initial height and is the maximum height of well. That is,
Find the work done as,
Hence, the work done required to pull the bucket to the top of the well is
This is True
answered false got it wrong
4. (9x^2 + 13x) + (4x^2 - 8x)
(9x^2 + 13x)
9x^2 = 81 x + 13 x = 94x
(4x^2 - 8x)
4x^2 = 16x - 8x = 8x
94x + 8x = 102x
The answer is 102x
5. (x^2 + 4x + 6) + (x^2 + 8x + 3)
(x^2 + 4x + 6)
4x + 6 = 10x
10x + x^2 = 10x^2
(x^2 + 8x + 3)
8x + 3 = 11x
x^2 + 11x = 11x^2
The answer i 11x^2
6. (-3x^2 + 2x - 8) + (x^2 + 4x)
(-3^2 + 2x + 8)
-3^2 = 9
2x + 8 = 10x
10x + 9 = 19x
(x^2 + 4x)
x^2 + 4x = 4x^2
19x + 4x^2 = 23x^2
The answer is 23x^2.