<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
Answer:
I have left $88
Step-by-step explanation:
Step two:
Given data
Initial amount= $56
deposited amount= $42
The balance after deposit will be= 56+42
=$98
Step two:
If I withdraw 10 dollars
The new balance will be
=98-10
=$88
Hence I have left $88
Answer:
B) ASA
Step-by-step explanation:
The ASA (Angle-Side-Angle) postulate states that if two angles and the included side of one triangle are congruent to two angles and the included side of another triangle, then the triangles are congruent. (The included side is the side between the vertices of the two angles)
In this case, angle U, side UY and angle Y are congruent to angle U, side UW and angle W
16%. You divide those two numbers and then multiply the answer by 100
https://www.khanacademy.org/math/precalculus/prob-comb/combinatorics-precalc/v/permutation-formula
I would watch a bunch of videos or ask a teacher or something for help