t=45min
d=4km
45min/60min = 0.75 hours
v=d/t
v=4km/0.75hours
v=5.33km/hour. So the answer is B. 45 minutes.
You first separate the triangle from the rectangle. Then multiply one side be one side.
Answer:
2.5
Step-by-step explanation:
If i am correct the first rectangle is 3 and the second is 7.5.
7.5 divided by 3 equals 2.5
The equation of a line is defined by: y=mx+b
Step 1: Find the slope (rise over run) so, the rise is 15.7 and the run is 6. 15.7/6=2.62
y=2.62x+b
Step 2: Find the b value (y intercept) - this is where the line goes through the y axis. In this case, it's 15.7
Step 3: add the slope and the b value together - y=2.62x+15.7