The phase 3 of a business report is the revision phase.
The revision phase involves revising, proof reading and evaluation.
In this phase, improving the content and sentence structure of the report, correcting the grammer, spelling, punctuation, and format of the report and adding, cutting, and recasting what has been written.
Therefore, the correct answer to the question is äll answer choices are correct".
Answer:
The correct answer is: a positive correlation.
Explanation:
Correlation can say something about the relationship between variables. It is used to understand:
1. If the relationship is positive or negative
2. The strength of the relationship.
Correlation is a powerful tool that provides vital pieces of information.
In the case of family income and family spending, it is easy to see that both rise or fall together in the same direction. This is called a positive correlation.
In the case of price and demand, the change occurs in the opposite direction, so that the increase in one is accompanied by a decrease in the other. This is known as a negative correlation.
Answer:
The Question is Incomplete; Full Question is as follows;
Using variable costing, what is the contribution margin for last year?
<em>Contribution Margin = $362,900</em>
Explanation:
Computation of expenditure margin by differential costing;
<em>Sales </em><em>Minus </em><em>variable cost </em>
= $1,558,000
- Variable cost of Manufacturing(190,000 units *$1.84)
= $349,600
— variable sales and administrative costs(190,000 units *$4.45)
= $845,500
= contribution margin = $362,900
<em>Keep in mind that; </em><em>Set or Fixed expenses and overhead costs are not taken into account when trying to calculate the contribution margin.</em>
Answer:
6.00 days
Explanation:
data provided
Inspection time = 3.7 days
Process time = 0.2 days
Move time = 1.3 days
Queue time = 0.8 days
The calculation of throughput time is given below:-
Throughput time = Inspection time + Process time + Move time + Queue time
= 3.7 days + 0.2 days + 1.3 days + 0.8 days
= 6.00 days
Here, we added the inspection time, process time , move time and queue time to reach at throughput time and we ignore the time spent waiting to be worked on in the factory as it is not relevant.
Answer: I honestly have no idea im just stupid and i need points so yea im sry bye
Explanation: